Davidson Athletic Training Room
The Davidson Athletic Training Room was updated in 2014 coinciding with the opening of the Harry L. Vance Athletic Center.
The nearly 5,000 square foot athletic training room features a large treatment area with modality stations to help with the treatment of injured athletes and a separate area designed specifically for functional rehabilitation. In addition, there is a designated area for taping.
The hydrotherapy room features 2 GRIMM hydrotherapy tubs - one is a full-time cold tub set at 47 degrees, while the second has the ability to be both hot (105 degrees) and cold, depending on what purpose is needed. Each tub is designed to hold up to 10 athletes at a time.
The athletic training room also features a doctor's office with the ability to perform medical evaluations by either Davidson's Team Physicians or Orthopedics.
The nearly 5,000 square foot athletic training room features a large treatment area with modality stations to help with the treatment of injured athletes and a separate area designed specifically for functional rehabilitation. In addition, there is a designated area for taping.
The hydrotherapy room features 2 GRIMM hydrotherapy tubs - one is a full-time cold tub set at 47 degrees, while the second has the ability to be both hot (105 degrees) and cold, depending on what purpose is needed. Each tub is designed to hold up to 10 athletes at a time.
The athletic training room also features a doctor's office with the ability to perform medical evaluations by either Davidson's Team Physicians or Orthopedics.
2026-27 Men's Basketball - Coach's Film on Newcomers (Malik Davis)
Tuesday, June 09
2026-27 Men's Basketball - Coach's Film on Newcomers (Jackson Keith)
Tuesday, June 09
2026-27 Men's Basketball - Coach's Film on Newcomers (Eetu Heinonen)
Tuesday, June 09
2026-27 Men's Basketball - Coach's Film on Newcomers (Tom Stoiber)
Tuesday, June 09











